India stands at a critical crossroads in its energy journey. As one of the world’s fastest-growing economies and third-largest energy consumer, the nation faces a dual challenge: meeting soaring energy demands while transitioning to cleaner sources. Energy storage technology has emerged as the linchpin for this transformation, enabling reliable power supply from intermittent renewable sources like solar and wind. This is precisely why India launched its ambitious Smart Storage Mission-a strategic initiative designed to position the country as a global leader in energy storage while reducing its dependence on imported fossil fuels.
Table of Contents
- India’s renewable energy ambitions and the storage imperative
- National Energy Storage Mission: laying the foundation
- Phased Manufacturing Program: building domestic capacity
- The manufacturing timeline
- Government incentives and support
- Electric vehicle transition mandates
- Current EV adoption status
- Reducing oil dependency through energy storage
- Integrating renewables with the national grid
- The road ahead
India’s renewable energy ambitions and the storage imperative
India has committed to achieving 500 GW of non-fossil fuel electricity capacity by 2030, with a target of fulfilling 50% of its energy requirements through renewable sources. This goal was announced at COP26 as part of the country’s “Panchamrit” climate pledge. The progress has been remarkable-renewables now constitute 50.07% of India’s total installed power capacity of 484.82 GW, achieving this COP26 commitment five years ahead of schedule.
However, solar and wind power generation is inherently variable-the sun doesn’t always shine, and winds don’t always blow when electricity demand peaks. This intermittency creates significant challenges for grid stability and reliability. Without adequate storage solutions, surplus renewable energy generated during peak production hours goes to waste, while conventional power plants must continue operating during low-production periods. Battery storage systems bridge this gap by capturing excess energy and releasing it when needed, making renewable power as reliable as conventional sources.
National Energy Storage Mission: laying the foundation
In February 2018, an Expert Committee under the chairpersonship of the Secretary, Ministry of New and Renewable Energy was constituted to draft India’s National Energy Storage Mission (NESM). The committee included representatives from relevant ministries, industry associations, research institutions, and subject matter experts.
The proposed NESM has a clear objective: to strive for leadership in the energy storage sector by creating an enabling policy and regulatory framework that encourages manufacturing, deployment, innovation, and cost reduction. NITI Aayog and the Rocky Mountain Institute’s joint report on India’s Energy Storage Mission proposed a three-stage solution approach:
Stage 1: Creating an environment for battery manufacturing growth through policy support and incentives. Stage 2: Scaling supply chain strategies to ensure reliable access to raw materials and components. Stage 3: Scaling battery cell manufacturing to achieve domestic production at competitive costs.
The mission identifies three key application areas for energy storage: integrating renewable energy with distribution and transmission grids, setting up rural microgrids with diversified loads or standalone systems, and developing the storage component of electric mobility plans.
Phased Manufacturing Program: building domestic capacity
Recognizing that India lacks significant natural reserves of lithium, cobalt, and other materials commonly used in batteries, the government developed a strategic manufacturing roadmap. In March 2019, the Union Cabinet approved the National Mission on Transformative Mobility and Battery Storage, which includes a five-year Phased Manufacturing Program (PMP) to support domestic battery production.
The manufacturing timeline
The phased roadmap focuses on large-scale module and pack assembly plants by 2019-20, followed by integrated cell manufacturing by 2021-22. The ultimate goal is establishing Giga-scale production facilities that can compete globally in both cost and quality.
This approach is practical. Since domestic battery cell manufacturing requires significant capital investment and technological expertise, India initially focused on assembling battery packs using imported cells while simultaneously building capabilities for complete cell manufacturing. The India Energy Storage Alliance (IESA) estimated that the energy storage market would grow to over 300 GWh between 2018-25, providing substantial demand to justify manufacturing investments.
Government incentives and support
The government introduced Production Linked Incentive (PLI) schemes for Advanced Chemistry Cell (ACC) battery storage to attract investments in domestic manufacturing. Budget allocations for the PLI Scheme for Automobiles and Auto Components reached Rs 3,500 crore for 2024-25, encouraging manufacturers to focus on economies of scale.
Additionally, GST on EVs and EV chargers has been kept at 5% compared to 28% on conventional vehicles, and customs duties on critical minerals like lithium and cobalt have been removed to reduce manufacturing costs.
Electric vehicle transition mandates
A major driver for battery storage demand in India is the transition to electric mobility. The steering committee on transformative mobility proposed banning sales of internal combustion engine three-wheelers by March 2023 and two-wheelers below 150cc by 2025. These recommendations aimed to make India a manufacturing hub for electric vehicles while creating massive domestic demand for lithium-ion batteries.
This bold move was strategically chosen because more than three-quarters of vehicles on India’s roads fall under the two- or three-wheeler category. By electrifying these segments first, India could achieve significant emissions reductions and build manufacturing expertise before tackling the more complex passenger car market.
Current EV adoption status
While the original 2023 and 2025 deadlines for complete electrification proved ambitious, progress has been substantial. India’s EV sales grew by 16.9% in FY25 to 1.97 million units, with electric two-wheelers and three-wheelers leading adoption. The three-wheeler segment has emerged as the frontrunner, with EV uptake reaching 54% in FY 2023-24-the highest across all vehicle segments.
The government’s FAME (Faster Adoption and Manufacturing of Electric Vehicles) scheme has been instrumental. As of June 2025, over 16.29 lakh electric vehicles have been supported under FAME II, including 14.35 lakh e-2 wheelers and 1.65 lakh e-3 wheelers.
Reducing oil dependency through energy storage
India’s strategic imperative for energy storage extends beyond environmental concerns. India imports 87% of its crude oil requirements, resulting in an annual import bill of approximately Rs 22 lakh crore. This dependency exposes the economy to global oil price volatility and strains the trade balance.
The National Mission explicitly aims to reduce India’s oil import dependence while enhancing the uptake of renewable energy and storage solutions. Every electric vehicle powered by domestically generated renewable electricity represents reduced oil imports for years to come.
The integration of battery storage with renewable energy also enhances energy security by diversifying the energy mix. When solar and wind power can be stored and dispatched on demand, they become viable alternatives to imported fossil fuels for baseload power generation.
Integrating renewables with the national grid
Beyond transportation, grid-scale battery storage is crucial for India’s power sector transformation. The contribution of renewables to overall electricity generation currently stands at about 19.5%, well short of the 2030 target of 50%. Battery storage can help close this gap by enabling greater penetration of variable renewable sources.
Large-scale storage projects are already underway. The world’s largest renewable energy park-a 30 GW solar-wind hybrid facility-is under installation in Gujarat. Such projects will require significant storage capacity to deliver reliable power output regardless of weather conditions.
India’s total non-fossil fuel capacity reached 217.62 GW as of January 2025, positioning the country well for its 500 GW target. However, realizing the full potential of this capacity requires matching investments in storage infrastructure.
The road ahead
India’s Smart Storage Mission represents a comprehensive approach to energy transformation, addressing manufacturing, policy, infrastructure, and demand creation simultaneously. The mission’s success will determine whether India can achieve its climate commitments while maintaining energy security and economic growth.
Key challenges remain, including securing reliable supply chains for critical minerals, developing skilled workforce for advanced manufacturing, and building charging infrastructure to support EV adoption. However, with US$ 196.98 billion worth of renewable energy projects underway and strong policy support, India is positioned to become a significant player in the global energy storage market.
The benefits extend beyond environmental goals. Energy storage manufacturing can create hundreds of thousands of jobs, reduce trade deficits, and position India as a technology leader in a rapidly growing global market. The mission’s emphasis on “Make in India” ensures that economic benefits flow to domestic industries and workers.
What do you think? As India pursues energy independence through storage technology, how might the country’s approach influence other developing nations facing similar challenges? And what role should international collaboration play in accelerating the global transition to renewable energy storage?
References
- https://www.pib.gov.in/PressNoteDetails.aspx?id=155063&NoteId=155063&ModuleId=3
- https://www.pib.gov.in/newsite/PrintRelease.aspx?relid=181698
- https://www.mercomindia.com/india-national-energy-storage-mission
- https://www.pmindia.gov.in/en/news_updates/cabinet-approves-national-mission-on-transformative-mobility-and-battery-storage/
- https://www.energy-storage.news/india-approves-national-mission-on-transformative-mobility-and-battery-storage/
- https://cleanmobilityshift.com/policy-regulation/union-budget-2024-key-highlights-for-indias-electric-vehicle-industry/
- https://diyguru.org/guide/indias-ev-policy-2025-explained/
- https://inc42.com/buzz/govt-proposes-sale-of-only-electric-two-three-wheelers/
- https://electrek.co/2019/05/22/india-electric-two-three-wheels/
- https://www.ibef.org/industry/electric-vehicle
- https://theicct.org/wp-content/uploads/2024/06/ID-169-FAME-opps_report_final.pdf
- https://en.wikipedia.org/wiki/Renewable_energy_in_India
- https://zerocarbon-analytics.org/energy/renewable-energy-in-india-is-ambition-being-realised/
- https://www.ibef.org/industry/renewable-energy
- https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=2073038
Leave a Reply